OUTPACE INDUSTRIES Engineering project brief 1. PROJECT Project name: Location: Industry: Facility type (industrial site / off-site infrastructure / substation / engineering networks / other): New construction or modification of an existing facility: 2. SCOPE What needs to be designed: Design stage: Key technical parameters: Required disciplines and deliverables: 3. PROJECT INPUTS Design brief: Technical requirements and connection conditions: Survey information: Existing plans, drawings and documentation: Applicable requirements, codes and standards: Missing inputs: 4. SCHEDULE AND APPROVALS Desired handover date: External review, permitting and approvals: Project decision-makers: 5. CONTACT Company: Name and role: Email / phone: Outpace targets a two-week design cycle after receipt of complete inputs, for an agreed project type and scope. Internal engineering review and revisions are included. External approvals are scheduled separately.